2020 LIST OF ICT PROJECTS

  1. LIST OF CONTRACTS ON PLANNING AND IMPLEMENTED RECENTLY

 

No.

Contract information

Project information

Main tasks of the contract

Fund

Implementation period

Remarks

1

  • Contract No. 05/HD -VILG-ICT
  • On development and completion of background data for monitoring project evaluation

- The project on strengthening land management and Vietnam's land database

- Fund: IDA International Development Association

- Client: Project management unit of the project on strengthening land management and central land database

Digitization planning of land database includes:

  • Develop inception report of the tasks
  • Organize to investigate, collect information, data and figures to build the project background data
  • Summarize, analyze and evaluate the collected documents.
  • Prepare analytical report on the project background data
  • Propose to adjust the project's monitoring index frame and update background data according to the project's additional indicators
  • Prepare summary report of the tasks
  • Organize meetings, conferences, seminars, consult experts about the products of the Package

IDA

2019 – present

Ongoing

2

Contract VILG-SL-TS-01.01/HD/DVKT

  • On completing cadastral records and building land database of Phu Yen district, Son La province

- The project on strengthening land management and land database

Fund: IDA International Development Association

- Client: Project management unit of the project on strengthening land management and central land database of Son La province using loan of the World Bank

Digitization planning of land database includes:

  • Background land spatial data of cadastral database
  • Land inventory statistics data
  • Database of land use planning and plans
  • Database of land prices

IDA

2019 - present

Ongoing

3

  • Contract CQS-A3-HPA-VNSAT
  • Consultancy service on supporting the pilot provinces to review the agricultural restructuring scheme

- Vietnam Sustainable Agriculture Transformation Project

Fund: WB

- Client: Project Management Unit of Component A Vietnam Sustainable Agricultural Transformation Project (VnSat)

  • Review and evaluate the results of the implementation of the provincial agricultural restructuring scheme/ plan
  • Propose orientations for adjustment, objectives and solutions to the provincial agricultural restructuring scheme in the upcoming time.
  • Official report of the agricultural restructuring schemes of 7 provinces

 WB

2018 - 2019

Completed

4

  • Contract  No. 03/2017/VIPM-ICT
  • - Consultancy service on Supporting the research and development of the Draft Economic Zone Law
  • - Project “Pollution Management Project for Industrial Zones of Dong Nai and Nhue-Day river basins”
  • - Fund: WB

- Client: Project Management Unit of Ministry of Planning and Investment - Pollution Management Project for Industrial Zones of Dong Nai and Nhue-Day river basins

  • Research international experience on construction, development and management of special economic zones
  • Review the situation of law enforcement, assess current legal documents related to the law project; survey and assess the state of social relations related to the policy content of the law project.
  • Synthesis and comparison of institutions, mechanisms, policies, management models of special economic zones in the world and recommendations to Vietnam
  • Support the development of a draft Law on Special Administrative - Economic Units and evaluate the impact of the new law
  • Support the Drafting Board and the Law Editing Team in the consultation process with related agencies/community, appraising and approving the law project at the National Assembly's meetings to complete the Law on Administrative - Economic Units.

 WB

2017 - 2018

Completed

5

- Contract No.: 02/HD2014-TV

- Consulting service on

+ Development of Planning Law

+ Institutional development

+ Managing the entire project as planned (WP)

+ Preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection.

- Project: Project preparation funds

- Fund: World Bank ODA

- Client: Project Coordination Unit for Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment

- Consulting on development of Planning Law

+ Consulting on Institutional development

+ Consulting to manage the entire project as planned (WP)

+ Consulting to preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection.

World Bank

2014-2015

Completed

6

Contract No. 1210/2013-HDDV

- Consulting service on Research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period  (2013 – 2020)

- Project: 00059714 – Assistance in strengthening the capacity of advising, reviewing and monitoring macroscopic economic policies

- Fund: UNDP

- Client: Economic Committee of National Assembly

- Total investment: 6,000 USD

 

 

- Implement research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020)

UNDP

2013-2014

Completed

7

Contract No. 05/CHPOV-TW-CS

- Consulting service on Research capacity of district and commune officials

 

- Project: Technical assistance Subproject for preparing Central Highlands Poverty Reduction Project

- Fund: WB

- Client: PMU of Central Highlands Poverty Reduction project

- Total investment: 150,000,000 USD

- Project Group A

- Conduct a capacity assessment study for district and commune officials

 

 

World Bank

2013 - 2014

Completed

8

Contract No. 11/2016/HDTV/ICT-BV Cho Ray

- Consultancy service on Development of Master Plan Scale 1/500

- Project: Construction of facility II - Cho Ray Hospital

- Fund: Japan ODA

- Client: Cho Ray Hospital

- Total investment of the period: USD 287,957,000 (equivalent to VND 5,702,982,000,000)

- Project Group A/level I

Development of Master Plan Scale 1/500

Japan ODA

2014-2015

 

..

...

...

...

...

...

...

The Company will present contracts upon request.

 

 

 

 

 

 

 

 

  1. LIST OF CONTRACTS ON PROJECT-PLANNING, ECONOMIC-TECHNICAL REPORTS PREPARED BY ICT RECENTLY.

 

No.

Contract information

Project information

Main tasks of the contract

Fund

Implementation period

Remarks

1

- Contract No.: 12/2019/HD-TV

- Consultancy service on Surveying, planning construction investment projects

- Project: Building a smart urban area in Sam Son city

- Fund: State Budget

- Client: PMU of Sam Son city construction investment project

- Total investment: VND 29,300 billion

- Project Group C

Consultancy on surveying, preparing construction investment projects

State Budget

2019

Ongoing

2

- Contract No.: 01/2017/ODAVN-FL

- Providing consulting service on preparing feasibility study report for the project on investment and equipment of fire and rescue vehicles for Vietnam Fire Fighting and Rescue Police force, phase 3 using ODA of the Government of Finland

- Project: Investment and equipment of fire and rescue vehicles for Vietnam Fire and Rescue Police force, phase 3 using ODA of the Government of Finland

- Fund: Finland

- Client: Vietnam Fire and Rescue Police

- Total investment: VND 409 billion

- Project Group: B

  • Preparation of feasibility study report for the project on Investment and equipment of fire and rescue vehicles for Vietnam Fire and Rescue Police force, phase 3 using ODA of the Government of Finland

Finland

2019

Ongoing

3

- Contract No.:      07/2018/HDTV-QLDA

- Consultancy service on Preparation of feasibility study report

- Project: Investment in equipment for Tuberculosis and Lung Specialized Hospital in Binh Duong Province

- Fund: State Budget

- Client: PMU of Construction Investment Project of Binh Duong Province

  • Preparation of feasibility study report

State Budget

2018

Ongoing

4

- Contract No.: 02/2017/HDTV

- Consultancy service on Adjustment (or updating) of feasibility study report  (FS)

- Project: Mekong Delta Region Urban Upgrading Project - My Tho City sub-project

- Fund: State Budget

- Client: PMU of Mekong Delta Region Urban Upgrading Project - My Tho City  

- Total investment: VND 814,114 billion

- Project Group A/level I

  • Adjustment (or updating) of feasibility study report  (FS) includes: Updating feasibility study report  (FS) and Basic Design and related documents such as Environmental Impact Assessment (EIA), Project Policy Framework (RPF) and Resettlement Action Plan (RAP)

State Budget

2017

Completed

5

- Contract No.: 02/2017/HDTV

- Consultancy service on Adjustment (or updating) of feasibility study report  (FS)

- Project: Mekong Delta Region Urban Upgrading Project – Cao Lanh City sub-project

- Fund: State Budget

- Client: Cao Lanh City People's Committee

- Representative of the Client: PMU of Mekong Delta Region Urban Upgrading Project – Cao Lanh City  

- Total investment of the period: VND 1,460 billion

- Project Group A/level I

  • Adjustment (or updating) of feasibility study report  (FS) includes: Updating feasibility study report  (FS) and Basic Design and related documents such as Environmental Impact Assessment (EIA), Project Policy Framework (RPF) and Resettlement Action Plan (RAP)

State Budget

2017

Completed

6

- Contract No.: 01/2017/HDTV-ODA

- Consultancy on preparing investment project

- Project: Project on Construction of Hai Phong General Hospital - Part I (part using ODA loans) using Korean ODA loans.

- Fund: Korea ODA

- Governing agency: Hai Phong City People's Committee

- Client: Hai Phong Department of Health

- Project management unit: PMU of the project on Construction Viet Tiep Friendship Hospital facility 2 (under Hai Phong Department of Health)

- Total investment of the period: USD 104,000,000

- Project Group A/ level I

  • Preparing the Project on Construction of Hai Phong General Hospital - Part I using Korean ODA loans.

Korea ODA

2017

Completed

7

- Contract No.: 01/ODAVN-KOR

- Consultancy service on Providing consulting services for the project "Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police Force using soft loans from the Economic Development Cooperation Fund (EDCF) of Korea”

- Project: Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police Force using soft loans from the Economic Development Cooperation Fund (EDCF) of Korea

- Fund: Korea ODA

- Client: Vietnam Fire and Rescue Police Department

- Total investment: USD 20,000,000

- Project Group A

- Preparing feasibility study report, design, estimates

- Preparing bidding document, bids evaluation for packages (i) supply of fire and rescue vehicles and (ii) entrusted import package

- Preparing Baseline survey

- Preparing Mid survey

- Preparing Final report

- Preparing impact assessment report of the project

Korea ODA

2015 - 2021

Ongoing

8

- Contract No.: 02/HDTV/BQLTDA HTKT/ICT/Tan Phong

- Consultancy on construction of documents of the "Northern mountainous urban program - Bac Kan Town", surveying, preparing construction investment projects, designing construction drawings and estimates, preparing bidding document, environmental impact assessment report for investment items phase I (2015 - 2016)

- Northern mountainous urban program - Bac Kan Town subproject

- Fund: ODA of WB

- Client: People's Committee of Bac Kan Town

- Total investment: USD 270,000,000

- Project Group A/ level I

- Construction of documents of the "Northern mountainous urban program - Bac Kan Town (Feasibility study report)

+ Surveying, preparing construction investment projects

+ Designing construction drawings and estimates

+ Preparing bidding document, bids evaluation for consultant selection on construction and consultancy

+ Environmental impact assessment report for investment items phase I  (2015-2016)

+ Social impact assessment report (SA)

World Bank

2014-2015

Completed

9

- Contract No.: 08/2014/HDTV/ICT-BV Chợ Rẫy

- Consultancy service on project  preparation (Feasibility study report)

- Project: Construction of facility II - Cho Ray Hospital

- Fund: Japan ODA

- Client: Cho Ray Hospital

- Total investment of the phase: USD 287,957,000 (equivalient to VND 5,702,982,000,000)

- Project Group A/ level I

- Preparing investment project (Feasibility study report) Project on Construction of facility II - Cho Ray Hospital

Japan ODA

2014-2015

Completed

10

- Contract No.: 090714/ICT-BVNDC

- Consultancy service on project  planning

- Project: Construction of Ben Tre General Hospital

- Fund: Korea ODA

- Client: Nguyen Dinh Chieu Hospital

- Total investment: 78,344,000 USD

- Project Group A/ level I

- Preparing investment project

Korea ODA

2014-2015

Completed

11

- Contract No.: 040515/TV/ICT-BV An Giang

- Consultancy service on investment project  planning

- Project: Supply of equipment for An Giang General Hospital

- Fund: ODA of Austrian Government

- Client: An Giang Central General Hospital

- Preparing investment project

Austria ODA

2015-2016

Completed

12

- Contract No.: 010315/HD/ICT-TTYTTP Quy Nhon

- Consultancy service on investment project planning

- Project: Supply of medical equipment for Quy Nhon General Hospital - Binh Dinh Province using EDCF loans of Korea

- Fund: Korea ODA

- Client: Quy Nhon City Medical Center

- Total investment: 3,000,000USD

- Preparing investment project

Korea ODA

2015-2016

Completed

13

- Contract No.: 18/TV/ICT-DHDDND

- Consultancy service on preparing economic-technical report

- Project: Wastewater treatment system of Nam Dinh Nursing University

- Fund: State budget

- Client: Nam Dinh Nursing University

Total investment: 6,500,000,000 VND

- Preparing economic-technical report

State budget

2016

Completed

14

- Contract No.: 06/2014/ICT-BVDT/HDTV

- Consultancy service on preparation of feasibility study report

 

- Project: Supply of medical equipment for Duc Tho General Hospital - Ha Tinh Province

- Fund: ODA of the Government of Korea

- Client: Duc Tho General Hospital

- Total investment: 3,000,000 USD

- Preparing feasibility study report

- Prepare bidding documents, evaluate bids to select contractor to supply and install medical equipment for the Hospital.

- Consultancy on supervision of medical equipment installation

Korea ODA

2014

Completed

15

- Contract No.: 01/2013/SYT-HDLDA

- Consultancy service on investment project  planning

- Project: Capacity building for health sector in Thua Thien Hue province using ODA of the Italian government

- Fund: Italy ODA

- Client: Thua Thien Hue Department of Health

- Preparing investment project 

Italy ODA

2013-2014

Completed

16

- Contract No.: 19/0912/HD-TV

- Consultancy service on construction investment project planning

- Project: Construction of Hanoi Pharmacy University facility in Bac Ninh

- Fund: Korea ODA

- Client: Hanoi University of Pharmacy

- Total investment: 50,000,000USD

- Project group A/level I

- Preparing construction  investment project

Korea ODA

2012-2014

Completed

17

- Contract No.: 38/2012/HDTV

- Consultancy service on Preparing investment project planning

- Project: Construction and expansion of Quang Ngai City Water supply system from 20,000m3 to 45,000m3/day 

- Fund: ADB

- Client: Quang Ngai Water Supply and Construction Joint Stock Company

- Total investment:  20,000,000 USD

- Preparing investment project

ADB

2012 - 2013

Completed

18

- Contract No.: 79B/2011/HD-TN&PTDT

- Consultancy service on Preparing construction investment project, geological topographic survey, environmental impact assessment, social survey report, resettlement report

- Project: Collection and treatment of wastewater in Long Dien town, Long Dien district, Ba Ria Vung Tau province

- Fund: Spain ODA

- Client: Ba Ria Vung Tau Urban Sewerage and Development One Member Limited Company

- Total investment:  100,000,000 USD

- Project group A/level I

  • Prepare investment project
  • Geological and topographic survey,
  • Survey sampling, testing waste water quality
  • Prepare environmental impact assessment (EIA),
  • Prepare social assessment report (SA) and connect with community consultation, survey the current status of underground technical works
  • Prepare resettlement action report(RAP)

Spain ODA

2011 - 2013

Completed

19

- Contract No.: 74/ICT-BVDKLT/HDTV

  • Consultancy service on investment project planning

 

- Project: Supply of medical equipment for Lac Thuy General Hospital - Hoa Binh Province

- Fund: ODA of the Government of Korea

- Client: PMU of basic construction project of Lac Thuy district

- Total investment: 3,000,000 USD

  • Prepare investment project

 

Korea ODA

2010

Completed

20

- Contract No.: 706/ICT-BVDKTC/HDTV

- Consultancy service on preparation of feasibility study report

 

- Project: Supply of medical equipment for Tan Chau General Hospital - An Giang province

- Fund: ODA of the Government of Korea

- Client: Tan Chau General Hospital

- Total investment: 3,000,000 USD

- Prepare feasibility study report

 

Korea ODA

2010

Completed

21

- Contract No.: 08/ICT-BVChau Doc/HDTV

- Consultancy service on preparation of feasibility study report

 

- Project: Supply of medical equipment for 500-bed Chau Doc Regional General Hospital - An Giang province.

- Fund: ODA of the Kuwait government

- Client: Chau Doc Regional General Hospital

- Total investment: 3,400,000 KWD (equivalent to 251,110,400,000VND)

- Prepare feasibility study report

 

Kuwait ODA

 

2012

Completed

22

- Contract No.: 688/ICT-DKCM/HDTV

- Consultancy service on:

+ Preparation of feasibility study report

+ Preparation of bidding documents, bids evaluation

+ Supervision of equipment installation

- Project: Supply of medical equipment for Ca Mau General Hospital funded by EDCF from the Korean Government.

- Fund: Korea ODA

- Client: Ca Mau Department of Health

- Total investment: 3,000,000 USD

- Prepare feasibility study report

- Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital.

- Consultancy on supervision of medical equipment installation

Korea ODA

2009-2012

Completed

23

- Contract No.: 672/ICT-BVHT/HDTV

- Consultancy service on:

+ Preparation of feasibility study report

+ Preparation of bidding documents, bids evaluation

+ Supervision of equipment installation

- Project: Supply of medical equipment for Ha Trung District General Hospital - Thanh Hoa province

- Fund: Korea ODA

- Client: Ha Trung District General Hospital

- Total investment: 3,000,000 USD

- Prepare feasibility study report

- Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital.

- Consultancy on supervision of medical equipment installation

Korea ODA

2008-2010

Completed

The Company will present contracts upon request.

                   

 

  1. LIST OF CONTRACTS ON PROJECT MANAGEMENT IMPLEMENTED BY ICT

 

No.

Contract information

Project information

Main tasks of the contract

Fund

Implementation period

Remarks

1

- Contract No.: 09/ICT-BVChau Doc/HDTV

- Consultancy service on project management

 

- Project: Supply of medical equipment for 500-bed Chau Doc Regional General Hospital - An Giang province.

- Fund: ODA of the Kuwait government

- Client: Chau Doc Regional General Hospital

- Total investment: 3,400,000 KWD (equivalent to 251,110,400,000VND)

- Consultancy on project management for the whole project.

Kuwait ODA

 

2017-present

Ongoing

2

- Contract No.: 02/HD2014-TV

- Consultancy service on:

+ Development of the Planning Law

+ Institutional building

+ Managing the whole project as planned (WP)

+ Preparing bidding documents, evaluating bids for 1 non-consulting package, and 14 packages for consultant selection.

- Project: Project preparation fund

- Fund: World Bank ODA

- Client: Project Coordination Unit of the Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment

- Consultancy on development of the Planning Law

+ Consultancy on Institutional building

+ Consultancy on managing the whole project as planned (WP)

+ Consultancy on preparing bidding documents, evaluating bids for 1 non-consulting package, and 14 packages for consultant selection.

World Bank

2014-2015

Completed

3

- Contract No.: 681009/HDTV/ICT-Quảng Bình

- Consultancy service on project management

 

 

- Project: Supply of vocational training equipment for Quang Binh Vocational Intermediate School using EDCF loans of the Korean Government.

- Fund: Korea ODA

- Client: Quang Binh vocational intermediate school

- Total investment: 3,000,000 USD

- Consultancy on project management for the whole project.

Korea ODA

2011-2013

Completed

4

- Contract No.: 090711/ICT-DKCM/HDTV

- Consultancy service on project management

 

 

- Project: Supply of medical equipment for Ca Mau General Hospital using EDCF loans of the Korean Government.

- Fund: Korea ODA

- Client: Ca Mau Department of Health

- Total investment: 3,000,000 USD

- Consultancy on project management for the whole project.

Korea ODA

2011-2013

Completed

...

...

...

...

...

...

...

 

The Company will present contracts upon request.

 

  1. LIST OF CONTRACTS ON SUPERVISION IMPLEMENTED BY ICT

 

 

No.

Contract information

Project information

Main tasks of the contract

Fund

Implementation period

Remarks

1

- Contract No.: 06/HDTV/DDND-ICT

- Consultancy service on Supervision of construction and equipment installation

- Project: Wastewater treatment system of Nam Dinh Nursing University

- Fund: State budget

- Client: Nam Dinh Nursing University

- Total investment: 15 billion

- Project group C

- Supervision of construction and equipment installation

World Bank

2019-present

Ongoing

2

- Contract No.: 06/HD-ICT

- Consultancy service on Supervision of construction and equipment installation

- Project: Construction of wastewater treatment system for Vietnam University of Traditional Medicine

- Fund: State budget

- Client: Vietnam University of Traditional Medicine

- Total investment: 5 billion

- Project group C

- Supervision of construction and equipment installation

World Bank

2018-2019

Completed

3

- Contract No.: 09/GS/ICT-APVE

- Consultancy service on Supply of consulting service on supervision of construction and equipment installation

- Project: Construction of Vietnamese German University

- Fund: World Bank ODA

- Client: PMU of the project ton Construction of Vietnamese German University

- Total investment: 100,000,000 USD

- Project group A/level I

- Supervision of construction and equipment installation

World Bank

2016-present

Ongoing

4

- Contract No.: 56/2016/HD-TVXD

- Consultancy service on Supervision of construction, procurement and installation of equipment for centralized wastewater treatment plant (phase I)

 

- Project: Da Nang high-tech park project

- Fund: State budget

- Client: PMU of the project on investment and construction of Da Nang high-tech park project

 

- Supervision of construction, procurement and installation of equipment for centralized wastewater treatment plant (phase I – Da Nang high-tech park project)

State budget

2016-present

Ongoing

5

- Contract:

- Consulting services on design and construction supervision - Project on Construction of Ca Mau city water drainage and waste water treatment system

- Project: Construction of Ca Mau city water drainage and waste water treatment system

- Fund: Italy ODA

- Client: Ca Mau Water Supply-Sewerage & Urban Works Company Limited

- Total investment: 13,000,000USD

- Project group A/level I

- Consultancy on detailed design,

- Preparation of bidding document, bids evaluation for construction contractor selection – Supervision of construction

Italy ODA

2012-present

Ongoing

6

- Contract No.: 13/MOF-ICT/2013

- Consultancy service on:

+ Procurement procedures

+ Supervision of equipment handover and installation

 

 

- Project: Water sector aid program for improvement of payment balance

- Fund: Italy ODA

- Client: Department of Debt Management – Ministry of Finance

- Total investment: 2,400,000EURO

- Preparation of bidding document, bids evaluation

- Supervision of equipment handover and installation

Italy ODA

2013

Completed

7

- Contract No.: 05/2015/GS/ICT-SNHY

- Consultancy service on supervision of equipment installation

- Project: Construction and procurement of medical equipment for Hung Yen Obstetrics and Pediatrics Hospital

- Fund: State budget

- Client: Hung Yen Obstetrics and Pediatrics Hospital

- Supervision of equipment installation

State budget

2015-2016

Completed

8

- Contract No.: 07/2015/GS/ICT-SNHY

- Consultancy service on construction supervision and equipment procurement and installation for medical gas supply station

- Project: Construction and procurement of medical equipment for Hung Yen Obstetrics and Pediatrics Hospital

- Fund: State budget

- Client: Hung Yen Obstetrics and Pediatrics Hospital

- Construction supervision and equipment procurement and installation for medical gas supply station

State budget

2015-2016

Completed

9

- Contract No.: 688/ICT-DKCM/HDTV

- Consultancy service on:

+ Preparation of feasibility study report

+ Preparation of bidding documents, bids evaluation

+ Supervision of equipment installation

Project: Medical equipment supply for Ca Mau General Hospital funded by EDCF of Korean Government

- Fund: Korea ODA

- Client: Ca Mau Department of Health

- Total investment: 3,000,000 USD

- Prepare Feasibility Study Report

- Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital.

- Consultancy on supervision of medical equipment installation

Korea ODA

2009-2012

Completed

10

- Contract No.: 672/ICT-BVHT/HDTV

- Consultancy service on:

+ Preparation of feasibility study report

+ Preparation of bidding documents, bids evaluation

+ Supervision of equipment installation

- Project: Supply of medical equipment for Ha Trung District General Hospital - Thanh Hoa province

- Fund: Korea ODA

- Client: Ha Trung District General Hospital

- Total investment: 3,000,000 USD

- Prepare Feasibility Study Report

- Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital.

- Consultancy on supervision of medical equipment installation

Korea ODA

2008-2010

Completed

...

...

...

...

...

...

...

The Company will present contracts upon request.

 

 

 

 

 

 

 

               

 

 

 

5. LIST OF CONTRACTS ON RESEARCH AND EVALUATION (ME) IMPLEMENTED RECENTLY BY ICT

 

No.

Contract information

Project information

Main tasks of the contract

Fund

Implementation period

Remarks

1

  • Contract No. 475/HD-SKHCN
  • Consulting service on the implementation of scientific research and technological development projects (Brand building and development)

- Project: Brand building and development

- Fund: State budget

- Client: Ben Tre Department of Science and Technology

  • Investigate, survey and collect data
  • Identify the province's strengths, weaknesses, comparative advantages in the production of export products (including products such as coconut, banana and fruits, rice, fish/shrimp/animals, etc, cocoa/chocolate) and tourism industry from 2016 to 2021
  • Develop a list of products and services that have the potential to build a brand
  • Recommendations and proposals for implementation plans

State Budget

2017-2019

Completed

2

  • Contract No. CQS-A3-HPA-VNSAT
  • Consulting service on supporting the pilot provinces to review the agricultural restructuring schemes

- Vietnam Sustainable Agriculture Transformation Project

Fund: WB

- Client: Project Management Unit of Component A Vietnam Sustainable Agricultural Transformation Project (VnSat)

  • Review and evaluate the results of the implementation of the provincial agricultural restructuring scheme/ plan
  • Propose orientations for adjustment, objectives and solutions to the provincial agricultural restructuring scheme in the upcoming time.
  • Official report of the agricultural restructuring schemes of 7 provinces

 WB

2018 - 2019

Completed

3

  • Contract No. 86/ICT-HD
  • Consulting service on the assessment of the status of the sanitation component of the program

Component Project on Rural Hygiene and Sanitation Behavior Change under the Results-based Rural Water and Sanitation Expansion Program, using loans of the World Bank

Fund: WB

- Client: Health Environment Management Agency

  • Develop a survey outline and a plan to conduct an assessment of the status of the Sanitation Component of the program
  • Designing tool sets to carry out the evaluation
  • Carry out the assessment in 04 provinces: Yen Bai, Lai Chau, Lang Son and Dak Lak.
  • Analyze collected data
  • Assessment report on the status of the Sanitation Component of the Program

 WB

2018 - 2019

Completed

4

  • Contract No. 03/2017/VIPM-ICT
  • Consulting service on Supporting the research and development of the Draft Economic Zone Law
  • Project “Pollution Management Project for Industrial Zones of Dong Nai and Nhue-Day river basins”
  • Fund: WB
  • - Client: Project Management Unit of Ministry of Planning and Investment - Pollution Management Project for Industrial Zones of Dong Nai and Nhue-Day river basins
  • Research international experience on construction, development and management of special economic zones
  • Review the situation of law enforcement, assess current legal documents related to the law project; survey and assess the state of social relations related to the policy content of the law project.
  • Synthesis and comparison of institutions, mechanisms, policies, management models of special economic zones in the world and recommendations to Vietnam
  • Support the development of a draft Law on Special Administrative - Economic Units and evaluate the impact of the new law
  • Support the Drafting Board and the Law Editing Team in the consultation process with related agencies/community, appraising and approving the law project at the National Assembly's meetings to complete the Law on Special Administrative - Economic Units.

 WB

2017 - 2018

Completed

5

  • Contract No.: 13/2017/HD-TV
  • Consulting service on preparing final evaluation monitoring report (M&E), impact evaluation, evaluating the effectiveness of the project and assessing the implementation situation during the operation exploitation phase of the project.

- Project: Domestic water supply of Quang Trach district, Quang Binh province

- Fund: Hungary ODA

- Client: People's Committee of Quang Trach district

- Client's representative: Quang Trach ODA project management unit

- Total investment:

- Project Group A

- Consultancy on preparing final evaluation monitoring report (M&E),

  • Consultancy on impact evaluation, evaluating the effectiveness of the project

- Consultancy on assessing the implementation situation during the operation exploitation phase of the project.

Hungary ODA

2017

Completed

6

- Contract No.: CQS1-16

- Consulting service on preparing Mid survey

- Project: North-East and Red River Delta Regions Health System Support Project (Norred)

- Fund: WB

- Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project

- Total investment: 150,000,000 USD

- Project Group A

- Preparing Mid survey of the project, including: (i) Inception Report; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report the results of data collection; (iv) Independent mid survey on evaluation of project implementation results; (v) Organize workshops to report, share results of the Report, and other workshops and training courses.

World Bank

2017

Completed

7

- Contract No.: CQS 2.15

- Consulting service on Researching, evaluating and supporting to improve hospital quality

- Project: North-East and Red River Delta Regions Health System Support Project (Norred)

- Fund: WB

- Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project

- Total investment: 150,000,000 USD

- Project Group A     

- Research, evaluate and support to improve hospital quality, including: (i) Detailed plan to perform the tasks of the contract and submit to the PMU; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report on the current status of hospital management capacity and hospital quality management; (iv) Master plan and annual detailed plan on hospital management and hospital quality improvement for the project in the period 2015-2020 of the Central PMU; (v) The project hospital's implementation plan template for hospital management and hospital quality improvement for the project each year and the whole period from 2015 to 2020; (vi) A set of indicators and tools to evaluate the progress and results of the implementation of the master plan, the detailed plan of the hospital management and hospital quality improvement for the project in the period 2015-2020; (vii) 3 conference planning and support participation; (viii) Designing and establishing a supporting training and consultancy unit as mentioned in part of the capacity building master plan for 2015-2020; (ix) Report the results of the pilot implementation of the hospital management andhospital quality improvement model according to the master and detailed plan of the hospital management andhospital quality improvement for the project in the period 2015-2020.

World Bank

2016-2018

Ongoing

8

- Contract No.: 15/HD-PPTAF01

- Consulting service on Resettlement Planning and Resettlement Action Policy Framework (RAP) and Project Due Diligence Report (DDR)

- Project: Technical Assistance Subproject for the preparation of the flood risk management project in Ho Chi Minh City

- Fund: WB

- Client: Construction Project Management Unit

- Total investment: 450,000,000 USD

- Project group A/level I

Prepare Resettlement Action Plan (RAP) and Resettlement Action Policy Framework (RPF) and Project Due Diligence Report (DDR) include:

  • Review and analyze missing spots of existing reports; Collect data, documents related to the project;
  • Zone, identify of affected areas and scales, identify of affected households, affected assets on land;
  • Socio-economic survey of affected households and making report;
  •  Research, investigation and evaluation on gender equality
  • Organize public consultation, government agencies.
  • Set up a resettlement action policy framework:
  • Resettlement Action Plan
  • Due Diligence Report of the project in accordance with the policies and regulations of the Government and the World Bank;
  • Complaint and proposal consideration mechanism (GRM) that have been implemented to resolve the grievances / related settlements of affected households.

World Bank

2015-2017

Completed

9

- Contract No.: 01/ODAVN-KOR

- Consulting service on Providing consulting service for the project fire and rescue “Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police force- using the soft loan of Korea EDCF”

Project: Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police force- using the soft loan of Korea EDCF

- Fund: Korea ODA

- Client: Vietnam Fire and Rescue Police Department

- Total investment: 20,000,000USD

- Project group A

- Preparation of investment project, design, estimates

- Preparation of bidding documents, bids evaluation for the packages (i) Supply of fire and rescue vehicles and (ii) the entrusted import package

- Preparation of Baseline survey

- Preparation of Mid survey

- Preparation of Final report

- Preparation of project impact assessment Report

 

Korea ODA

2015 - 2021

Ongoing

10

- Contract No.: CPMU.CQS1/2014

- Consulting service on preparing Baseline survey of the project

 

- Project: North-East and Red River Delta Regions Health System Support Project (Norred)

- Fund: WB

- Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project

- Total investment: 150,000,000 USD

- Project Group A

Preparation of Baseline survey of the project, including: (i) Inception report; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report on initial investigation activities; (iv) data analysis and processing reports; (v) Monitoring and evaluation Manual; (vi) Baseline survey

World Bank

2014-2016

Completed

11

- Contract No.: 09/DGTDMT/ICT-BVNDC

- Consulting service on Preparing environmental impact assessment (EIA) report

- Project: Construction of Ben Tre General Hospital

- Fund: Korea ODA

- Client: Nguyen Dinh Chieu Hospital

- Total investment: 78,000,000 USD

- Project group A/level I

- Prepare environmental impact assessment (EIA) report

Korea ODA

2015-2017

Completed

12

- Contract No.: 767/2014-HD

- Consulting service on Preparing social impact assessment (SIA) report, resettlement plan and resettlement action plan  (RAP)

- Project: Technical assistance subproject for preparation of “Ho Chi Minh Green Transport Development Project”

- Fund: WB

- Client: Urban-civil Works Construction Investment Management Authority of Ho Chi Minh

- Total investment :150,000,000 USD

- Project group A/level I

Prepare social impact assessment (SIA) report, resettlement plan and resettlement action plan  (RAP), including:

Review and analyze missing spots of existing reports; Collect data, documents related to the project;

Zone, identify of affected areas and scales, identify of affected households, affected assets on land;

Socio-economic survey of affected households and making report

Research, investigation and evaluation on gender equality

Organize public consultation, government agencies.

Set up a resettlement action policy framework:

Resettlement Action Plan

Due Deligence Report of the project in accordance with the policies and regulations of the Government and the World Bank

World Bank

2015 - 2016

Completed

13

- Contract No.: 02/HDTV/BQLTDA HTKT/ICT/Tan Phong

- Consulting service on developing the document "Program in the Northern mountains region - Bac Kan Town"), conducting survey, establishment of construction investment projects, Construction drawing design and cost estimation, making the bidding documents, Environmental impact assessment report for investment items in Phase I (2015 – 2016)

- Urban development program in the northern mountains region – Bac Kan town subproject

- Fund: World Bank ODA

- Client: Bac Kan Town People’s Committee

- Total investment: 270,000,000 USD

- Project group A/level I

- Development of the document " Program in the northern mountains region - Bac Kan Town") (Feasibility study report)

-  Conducting survey, establishment of construction investment projects

-  Construction drawing design and cost estimates

-  Preparing the bidding documents, bids evaluation for selection of construction contractor and consultancy contractor

- Environmental Impact Assessment (EIA) for investment items in Phase I (2015-2016)

-  Social Impact Assessment Report (SA)

+ Research, investigation and evaluation on gender equality

+ Research, investigation and evaluation of ethnic minorities

World Bank

2014-2015

Completed

14

Contract

- Consulting service on Assistance in assessing impacts of Water Supply and Sanitation Program on diseases of under-five children

 

- Project: Child survival and development project

- Fund: UNICEF

- Client: Management Unit of child survival and development project - Health Environment Management Agency

 

  • Development of the impact assessment outline of clean water and sanitation interventions on children’s diseases
  • Development of tools for field trials and surveys
  • Collection of available data and field data
  • Make the final report
  • Presentation of the report at the workshop and popularization of the report
  • Proposal of further research directions.

UNICEF

2014-2015

Completed

15

- Contract No.: 02/HD2014-TV

- Consulting service on

+ Development of Planning Law

+ Institutional development

+ Managing the entire project as planned (WP)

+ Preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection.

- Project: Project preparation funds

- Fund: World Bank ODA

- Client: Project Coordination Unit for Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment

- Consulting on development of Planning Law

+ Consulting on Institutional development

+ Consulting to manage the entire project as planned (WP)

+ Consulting to preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection.

World Bank

2014-2015

Completed

16

Contract No. 1210/2013-HDDV

- Consulting service on Research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period  (2013 – 2020)

- Project: 00059714 – Assistance in strengthening the capacity of advising, reviewing and monitoring macroscopic economic policies

- Fund: UNDP

- Client: Economic Committee of National Assembly

- Total investment: 6,000 USD

 

 

- Implement research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020)

UNDP

2013-2014

Completed

17

Contract No. 05/CHPOV-TW-CS

- Consulting service on Research capacity of district and commune officials

 

- Project: Technical assistance Subproject for preparing Central Highlands Poverty Reduction Project

- Fund: WB

- Client: PMU of Central Highlands Poverty Reduction project

- Total investment: 150,000,000 USD

- Project Group A

- Conduct a capacity assessment study for district and commune officials

 

 

World Bank

2013 - 2014

Completed

18

Contract No. 0708/ICT-Ayunpa/LBCTK/HDTV

- Consulting service on Making final report of the project (Completion report of the project)

 

- Project: Investment in Vocational Training Equipment for AYUNPA Vocational Intermediate School

- Fund: Korea ODA

- Client: PMU Investment in Vocational Training Equipment for AYUNPA Vocational Intermediate School

- Total investment: 3,000,000 USD 

- Making final report of the project (Completion report of the project)

 

Korea ODA

2013 - 2014

Completed

19

- Contract No.: 141211/HD_TV

- Consulting service on Preparation of reports to support the evaluation of Korea - Eximbank bank for the project "Construction of Pharmacy University in Bac Ninh"

- Project: Construction of Hanoi Pharmacy University - new facility in Bac Ninh province

- Fund: Korea ODA

- Client: Hanoi Pharmacy University

- Total investment: 57,000,000 USD

- Project group A/level I

  • Prepare socio-economic impact assessment report (SIA)

+ Research, investigation and evaluation on gender equality

+ Research, investigation and evaluation of ethnic minorities

  • Prepare financial-economic analysis report
  • Prepare environmental impact assessment report (EIA)
  • Prepare resettlement action report (RAP)

Korea ODA

2011 - 2014

Completed

20

- Contract No.: 39/2012/HDTV

- Consulting service on Preparation of report to support “Construction and Expansion of Quang Ngai city water supply system (from 20,000m3 to 45,000m3/day)”

- Project: Construction and Expansion of Quang Ngai city water supply system (from 20,000m3 to 45,000m3/day)”

- Fund: ADB

- Client: Quang Ngai water supply and construction joint stock company

- Total investment:  20,000,000 USD

  • Prepare socio-economic impact assessment report (SIA)

+ Research, investigation and evaluation on gender equality

+ Research, investigation and evaluation of ethnic minorities

  • Prepare financial-economic analysis report
  • Prepare environmental impact assessment report (EIA)
  • Prepare resettlement action report (RAP)

ADB

2012 - 2013

Completed

21

- Contract No.: 79B/2011/HD-TN&PTDT

- Consulting service on Preparing investment project on work construction, geological and topography survey, environmental impact assessment, social investigation report, resettlement report

- Project: Collection and treatment of wastewater in Long Dien town, Long Dien district, Ba Ria Vung Tau province

- Fund: Spain ODA

- Client: Ba Ria Vung Tau Urban Sewerage and Development One Member Limited Company

- Total investment:  100,000,000 USD

- Project group A/level I

  • Prepare environmental impact assessment report (EIA),
  • Prepare social assessment report (SA) and connect with community consultation, survey the current status of underground technical works

+ Research, investigation and evaluation on gender equality

+ Research, investigation and evaluation of ethnic minorities

  • Prepare resettlement action report(RAP)
  • Preparing investment project
  • Geological and topographic survey,
  • Survey sampling, testing waste water quality

Spain ODA

2011 - 2013

Completed

22

- Contract No.: 18/2010/HDTV-TCDL-LDNT

- Consulting service on Procurement, implementation of core bank system for EVN Finance

- Project: Procurement, implementation of core bank system for EVN Finance

- Fund: Enterprise

- Client: EVN Finance

- Total investment:

- Project Group A

- Consult to support the selection of core banking solutions (business software and data center) including:

+ Assess the status: Review the strategic business development, review organizational structures and resources, review business operations, business processes and operation of information technology, technology application and infrastructure…

+ Set up a solution request profile: Organize key user sessions to collect requirements for Core banking system and data center. Propose a comprehensive solution for Core banking system. Make requirements for professional, technical, and contractor’s functions. Develop criteria to assess proportion of technical and financial factors, assessment criteria for selection of core banking system and selection of solutions for the Data Center and development of Bidding Documents based on standards appropriate with EVN Finance.

   + Evaluate and select suppliers.

- Consult on monitoring the project of implementation of core banking system.

Enterprise

2010-2011

Completed

23

- Contract No.: 01/2017/HDTV-ODA

- Consulting service on preparation of investment project 

+ Environmental impact assessment report (EIA),

+ Social impact assessment study (SA)

+ Resettlement Action Plan (RAP) and resettlement policy framework (RPF)

Project: Project on Construction of Hai Phong General Hospital - Part I (part using ODA loans) using Korean ODA loans.

- Fund: Korea ODA

- Governing agency: Hai Phong City People's Committee

- Client: Hai Phong Department of Health

- Project management unit: PMU of the project on Construction Viet Tiep Friendship Hospital facility 2 (under Hai Phong Department of Health)

- Total investment of the period: 104,000,000 USD

- Project Group A / level I

-  Prepare Environmental impact assessment report (EIA),

+ Social impact assessment study (SA)

+ Research, investigation and evaluation on gender equality

-  Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF)

 

Korea ODA

2017

Completed

24

- Contract No.: 08/2014/HDTV/ICT-BV Cho Ray

- Consulting service on project preparation (Feasibility study repport)

+ Environmental Impact Assessment (EIA)

+ Social impact assessment (SA)

+ Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF)

- Project: Construction of facility II – Cho Ray Hospital

- Fund: Japan ODA

- Client: Cho Ray Hospital

- Total investment of the phase: 287,957,000 USD (equal to 5,702,982,000,000 VND)

- Project group A/level I

-  Environmental Impact Assessment (EIA)

+ Social impact assessment (SA)

+ Research, investigation and evaluation on gender equality

+ Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF)

Japan ODA

2014-2015

Completed

Our Company will present contracts upon request.