24/06/2015 - Lượt xem: 885
|
Name of project (Place & Client) |
Duration |
Funding source |
Description of assignment |
Project |
|
Name of project: Construction of technical general treatment building blocks of Military traditional medicine hospital project Project's Owner: PMU of Construction of technical general treatment building blocks of Military traditional medicine hospital project Project location: Hoang Mai, Hanoi |
2016 | Capital of state budget |
- Preparation of Request for Proposal; - Assistance in procedures of Request for proposal; - Proposal evaluation |
|
|
Project name: North East and Red River Delta Regions Health System Support Project Project's Owner: The Ministry of Health Project Implementer: The Ministry of Health Project sites: The Project will be implemented in 13 provinces in the Red River Delta and North East Regions, including Hai Duong, Hung Yen, Ha Nam, Nam Dinh, Thai Binh, Ninh Binh, Lang Son, Tuyen Quang, Yen Bai, Thai Nguyen, Phu Tho, Bac Giang and Hoa Binh |
2016 | WB | - The Project aims to assist the implementation of the National Health Strategy to promote access to necessary health services in provinces under the Project, which complies to the national strategies and policies on developing the health system, especially the universal health coverage policy and the elimination of overcrowding, by enhancing the capacity in delivering qualified health services and managing at provincial and district level, and by promoting access to these services, with priority to disadvantaged groups in the North East and Red River Delta Regions | |
|
Purchase of medical equipment under the project of medical equipment procurement in 2016 Client: Bac Giang Transportation Clinic Address: No 11, Xuong Giang street – Bac Giang city – Bac Giang province |
2016 | Capital of state budget | Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed at Hue Transport Hospital in accordance with the required progress and given a trial operation to ensure they have technical features suitable with contract requirement | |
|
Purchase of medical equipment under the project of medical equipment procurement in 2016 Client: Hai Phong Transportation Hospital Address: No 40, Nam Moi street – Hung Vuong ward – Hong Bang district – Hai Phong city |
2016 | Capital of state budget | Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed at Hue Transport Hospital in accordance with the required progress and given a trial operation to ensure they have technical features suitable with contract requirement | |
|
Purchase of medical equipment under the project of medical equipment procurement in 2016 Client: Thanh Hoa Transportation Clinic Address: Lot B-C, Bac Cau Hac urban – Dong Tho ward – Thanh Hoa city |
2016 | Capital of state budget | Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed at Hue Transport Hospital in accordance with the required progress and given a trial operation to ensure they have technical features suitable with contract requirement | |
|
Preparation of Request for proposal and evaluation of proposal Client: Cho Ray Hospital Address: 201B Nguyen Chi Thanh street, Ward 12, District 5, Ho Chi Minh City |
2016 | JICA |
- Preparation of Request for Proposal; - Assistance in procedures of Request for proposal; - Proposal evaluation |
|
|
Consulting service for preparation of proposal on investment policy report Client: Da Nang University of Medical Technology and Pharmacy Address: 99 Hung Vuong – Da Nang City |
2016 | Capital of state budget | - preparation of proposal on investment policy report | |
|
Purchase of digital X-ray system under the project of medical equipment procurement in 2015 Client: Da Nang Transport Hospital Address: No.68 Hoang Van Thai, Hoa Minh Ward, Lien Chieu District, Da Nang City
|
2015 |
Capital of state budget |
Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed at Da Nang Transport Hospital in accordance with the required progress and given a trial operation to ensure they have technical features suitable with contract requirements. |
|
|
Purchase of digital X-ray system under the project of medical equipment procurement in 2015 Client: Hue Transport Hospital Address: No.17 Bui Thi Xuan, Duc ward, Hue City
|
2015 |
Capital of state budget |
Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed at Hue Transport Hospital in accordance with the required progress and given a trial operation to ensure they have technical features suitable with contract requirements. |
|
|
Purchase of 3D colored ultrasound machine under the project of medical equipment procurement in 2015 Client: Bac Giang Transport General Clinic Address: No.11 Xuong Giang Road, Bac Giang City, Bac Giang Province
|
2015 |
Capital of state budget |
Supplying right items, categories, technical specifications, origin, model, … as required by the Client. The goods are delivered and installed in accordance with regulations on current standards and criteria. In addition, the transportation, inspection and testing equipment are carried out in the right procedures. |
|
|
Procurement of medical equipment (High-frequency digital x-ray system and dry printer) Client: Nghe An Pharmaceutical and Medical Equipment Joint Stock Company Address: No. 3 Nguyen Binh Khiem Street, Hung Dung Ward, Vinh City, Nghe An Province
|
2015 |
|
Procurement of high-frequency digital x-ray system, model RADspeed |
|
|
Consulting services for supervision of equipment installation Package: Purchasing equipment for Hung Yen Obstetrics and Pediatrics Hospital under the project of construction and medical equipment procurement for Hung Yen Obstetrics and Pediatrics Hospital Client: Hung Yen Obstetrics and Pediatrics Hospital Address: Hiep Cuong commune, Kim Dong district, Hung Yen province |
2015 |
Capital of state budget |
- Inspecting installation conditions in accordance with legal provisions; - Reviewing the appropriateness between contractor’s actual qualifications in the installation process and that in bids document and contract of equipment supply and installation; - Inspecting and supervising the quality of materials and equipment installed by work construction contractor and equipment supply contractor in accordance with design requirements; - Inspecting and supervising the process of construction and equipment installation (construction solutions, machines for construction, …). |
|
|
Consulting services for supervision of construction and equipment installation Client: Hung Yen Obstetrics and Pediatrics Hospital Address: Hiep Cuong commune, Kim Dong district, Hung Yen province |
2015 |
Capital of state budget |
- Reviewing conditions for work commencement in accordance with legal provisions; - Inspecting the appropriateness between the detailed design and actual construction site; - Inspecting the appropriateness between estimated quantity and construction drawings; - Inspecting the appropriateness between contractor’s actual qualifications in construction, equipment supply and installation and that in bids document as well as construction contract; - Inspecting and supervising the quality of materials and equipment installed by work construction contractor and equipment supply contractor in accordance with design requirements; - Inspecting and supervising the process of construction and equipment installation. |
|
|
Preparation of bidding document and bids evaluation for the package No.3 under the project of Yen Bai stockpile Client: Project management unit of construction investment projects – General Department of State Reserve Address: No.343 Doi Can Street, Ba Dinh District, Hanoi |
2015 |
Capital of state budget |
- Preparation of bidding document; - Assistance in procedures of bidding process; - Bid evaluation;
|
|
|
Project name: North East and Red River Delta Regions Health System Support Project Project's Owner: The Ministry of Health Project Implementer: The Ministry of Health Project sites: The Project will be implemented in 13 provinces in the Red River Delta and North East Regions, including Hai Duong, Hung Yen, Ha Nam, Nam Dinh, Thai Binh, Ninh Binh, Lang Son, Tuyen Quang, Yen Bai, Thai Nguyen, Phu Tho, Bac Giang and Hoa Binh Project validity: 6 years as soon as the Credit Agreement signed with the WB comes to effect |
From 2015 |
WB |
- The Project aims to assist the implementation of the National Health Strategy to promote access to necessary health services in provinces under the Project, which complies to the national strategies and policies on developing the health system, especially the universal health coverage policy and the elimination of overcrowding, by enhancing the capacity in delivering qualified health services and managing at provincial and district level, and by promoting access to these services, with priority to disadvantaged groups in the North East and Red River Delta Regions. |
|
|
Supply and installation of food equipments for University of Economic and Technical Industries Client: University of Economic and Technical Industries |
2014 |
Ministry of Industry and Trade |
- Supply and installation of food equipments for University of Economic and Technical Industries |
|
|
Child survival and development project Client: Management Unit of child survival and development project – Health Environment Management Agency |
2014 |
UNICEF |
- Assistance in assessing the impacts of Water Supply and Sanitation Program on the diseases of under-five children |
|
|
Ben Tre General Hospital Construction Project Client: Nguyen Dinh Chieu Hospital |
2014 |
ODA Korea |
- Preparation of feasibility study report
|
|
|
Cho Ray Vietnam – Japan Friendship Hospital Development Project Client: Cho Ray Hospital – Ho Chi Minh city |
2014 |
ODA |
- Preparation of feasibility study report
|
|
|
Consulting service for document preparation of “Urban development program in the northern mountains region – Bac Kan town” (Feasibility Study Report) - Client: Bac Kan Town People’s Committee |
2014-2015 |
WB |
- Providing the service for document preparation of “Urban development program in the northern mountains region – Bac Kan town” (Feasibility Study Report); - Survey and preparation of investment project for construction; - Preparation of detailed and cost estimates; - Preparation of bidding documents; - Preparation of environmental impact assessment report for invested items. |
|
|
Project management assistance for activities relevant to the law on planning under PPTAF project. - Client: Coordination Board of PPTAF project – Department of Foreign Relations, Ministry of Planning and Investment. |
2014~2015 |
WB |
- Providing service and management measures in accordance with requirements of Vietnam Government and World Bank; - Coordination of activities of experts in drafting and issuing the planning law; - Assistance in selection of consulting contractor and other services; |
|
|
Medical Equipment Supply for Lac Thuy General Hospital in Hoa Binh Province - Location: Hoa Binh - Client: Management Unit of Lac Thuy District Construction Projects, Hoa Binh province |
3/2014 |
ODA Korea |
- Consulting in preparation of bidding documents and evaluation of bids; - Supervision of equipment supply and installation. |
|
|
Medical Equipment Supply for Tan Chau General Hospital in An Giang Province - Location: An Giang - Client: Tan Chau General Hospital |
3/2014 |
ODA Korea |
- Consulting in project management. |
|
|
Provision of Medical Equipment for Duc Tho General Hospital in Ha Tinh Province Location: Ha Tinh - Client: Duc Tho General Hospital |
3/2014 |
ODA Korea |
- Consulting in project management. - Preparation of feasibility study report; - Consulting in preparation of bidding documents and evaluation of bids; - Supervision of equipment supply and installation. |
|
|
Urban development for Long Xuyen City – An Giang province - Location: An Giang - Client: Long Xuyen City People’s Committee |
3/2014 |
It is expected to use WB loan |
- Consulting in preparation of detailed outline; - Construction survey for preparing FS; - Preparation of FS report. |
|
|
Studying the capability of communal and district officers under the project of poverty reduction for Tay Nguyen region - Location: Hanoi - Client: PPTAF Sub-project Management Board – project of poverty reduction for Tay Nguyen region.
|
5 months |
WB |
- Studying the capability of communal and district officers |
|
|
Aid program of Italian Government for water sector, stage II - Location: Hanoi - Client: Department of Debt Management and External Finance, Ministry of Finance |
36 months |
ODA Italia |
- Providing the service of procurement consultancy to support Ministry of Finance implementing the Program in accordance with the signed Agreement. |
|
|
Project 00059714 “Assistance to strengthen the capacity of advice, appraisal and supervision for the macroeconomic policy” - Location: Hanoi - Client: Economic Committee of Congress |
11/2013 – 3/2014 |
UNDP |
- Study “Management institution renovation and ODA use and supervision to enhance the stability of national and foreign debt by Vietnam during the new development period (2013-2020) |
|
|
PPTAF Sub-project under the project of Poverty reduction for Tay Nguyen region - Location: Hanoi - Client: PPTAF Sub-project Management Board – project of poverty reduction for Tay Nguyen region |
9/2013 – 10/2013 |
WB |
- Supply the office equipment. |
|
|
Project of campus II construction – Cho Ray Hospital - Location: Hochiminh city - Client: Cho Ray Hospital |
2013 – Nay |
ODA Japan |
- Preparation of master planning 1:500 |
|
|
Project of strengthening the capacity for Thua Thien Hue medical sector - Location: Hue city - Client: Thua Thien Hue Department of Health |
1/2013 – 3/2013 |
ODA Italia |
- Preparation of FS - Preparation of construction design |
|
|
Ca Mau Sanitation Project, ODA project funded by Italian Government - Location: Ca Mau city - Client: Ca Mau Water Supply-Sewerage & Urban Works Company Limited |
5/2012 – 1/2016 |
ODA Italia |
- Preparation of detailed design - Construction supervision |
|
|
Construction of Hanoi Pharmacy University, Bac Ninh Campus - Location: Bac Ninh - Client: Hanoi Pharmacy University |
11/2011 – 6/2013 |
ODA Korea |
- Preparation of Feasibility Study Report; - Preparation of Financial Analysis report, EIA report; - Preparation of Socio-economic report. - Preparation of Environmental Management Plan (EMP) and Resettlement plan report; - Preparation of project implementation manual. |
|
|
Project of Construction and Expansion of Quang Ngai city water supply system (from 20,000m3 to 45,000m3/day). - Location: Quang Ngai - Client: Quang Ngai water supply and construction joint stock company |
2/2012 – 8/2012 |
ADB |
- Preparation of Feasibility Study Report - Preparation of environmental impact assessment report; - Preparation of Socio-economic report; - Preparation of Financial Analysis report - Preparation of Environmental Management Plan (EMP) and Resettlement plan report. |
|
|
Project of Medical Equipment supply for Chau Doc Regional General Hospital - Location: An Giang - Client: Chau Doc Regional General Hospital |
4/2012 – nay |
ODA Kuwait |
- Preparation of detailed outline; - Preparation of Feasibility Study Report - Preparation of Request for Proposal, Bids Evaluation for contractor selection - Supervision of equipment supply, installation and commissioning - Consulting in project management.
|
|
|
Project of strengthening the capacity of medical sector in Quang Nam province - Location: Quang Nam - Client: PMU of strengthening the capacity of medical sector in Quang Nam province |
4/2012 – 8/2012 |
ODA Italia |
- Preparation of detailed outline; - Preparation of Feasibility Study Report.
|
|
|
Construction of drainage system and environmental improvement for Cam Lo town, Cam Lo district, Quang Tri province - Location: Quang Tri - Client: PMU of Cam Lo district construction investment – Quang Tri province |
2012 |
ODA Italia |
- Consulting in geographical survey for FS preparation. |
|
|
Medical Equipment supply for Ca Mau General Hospital in Ca Mau City - Location: Ca Mau city - Client: Ca Mau General Hospital |
7/2011 – 1/2013 |
ODA Korea |
- Preparation of Feasibility Study Report - Preparation of Request for Proposal, Bids Evaluation for contractor selection - Consulting in project management.
|
|
|
Binh Thuan Province Water Sector Project - Location: Binh Thuan - Client: PMU of Binh Thuan Province Water Sector |
5/2011 - |
ODA Italia |
- Preparation of Request for Proposal and Bids Evaluation |
|
|
Project of Wastewater Collection and Treatment Works for Long Dien Town, Long Dien District, Ba Ria Vung Tau Province - Location: Vung Tau - Client: BUSADCO |
5/2011 – 5/2012 |
ODA Spain |
- Preparation of Feasibility Study Report
|
|
|
Construction of National Information and Communications University - Location: Hanoi - Client: Ministry of Information and Communications |
4/2011 – 6/2011 |
ODA Korea |
- Preparation of detailed outline |
|
|
Medical Equipment Supply for Lac Thuy General Hospital in Hoa Binh Province - Location: Hoa Binh - Client: Management Unit of Capital Construction Projects of Lac Thuy District |
12/2010 |
ODA Korea |
- Preparation of Feasibility Study Report
|
|
|
Medical Equipment Supply for Quy Nhon City Medical Centre - Location: Binh Đinh - Client: Binh Dinh Department of Health |
8/2010 – 10/2010 |
EDCF Korea |
- Preparation of Feasibility Study Report
|
|
|
Investment for software system of corebank - Location: Hanoi - Client: EVN Finance Joint Stock Company |
8/2010 – 10/2011 |
Private capital |
- Consulting in selection of corebank system solutions and supervision of corebank system implementation. |
|
|
Mekong Delta Small and Medium towns water supply program - Location: 06 provinces of Mekong Delta region - Client: VDB |
10/2009 – 12/2012 |
ODA France
|
- Technical assistance for provincial water supply companies in Mekong Delta region: + Strengthening the long-term capacity of technique, commerce, and management for water supply companies based on the action plan of capacity strengthening. + Assistance in long-term capacity strengthening +Appraisal and supervision for funded project.
|
|
|
Medical Equipment Supply for Tan Chau General Hospital - Location: An Giang - Client: Tan Chau General Hospital |
10/2009 – 6/2011 |
EDCF – Korea |
- Preparation of Feasibility Study Report - Consulting in the selection of contractors - Provision of consultancy services for supervision of equipment supply and installation |
|
|
Vocational equipment supply for Quang Binh Vocational Training Intermediate College projectLocation: Quang Binh - Client: Quang Binh Vocational Training Intermediate College |
5/2009 – 9/2011 |
EDCF – Korea |
- Preparation of Request for Proposal and Bids Evaluation; - Provision of consultancy services for supervision of equipment supply and installation - Consulting in project management. |
|
|
Vocational training equipment supply for Ayunpa Vocational Training Intermediate College project - Location: Gia Lai - Client: PMU of Ayunpa Vocational Training Intermediate College project |
10/2009 – 5/2013 |
EDCF – Korea |
- Preparation of detailed outline - Preparation of Feasibility Study Report - Providing the import service - Consulting in project management.
|
|
|
Supply vocational equipment for Tra Vinh Vocational Training Intermediate College - Location: Tra Vinh - Client: Tra Vinh Department of Labor, War Invalids and Social Affairs |
7/2009 – 9/2009 |
EDCF – Korea |
- Preparation of Feasibility Study Report
|
|
|
Construction of Phuong Nam Private Economic-Technical Intermediate College projectLocation: Hochiminh city - Client: Phuong Nam Private Economic-Technical Intermediate College |
7/2009 - Nay |
VDB |
- Preparation of Feasibility Study Report - Preparation of technical design and total cost estimates - Preparation of Request for Proposal and Bids Evaluation, - Provision of consultancy services for supervision of equipment supply and installation - Consulting in audit and final accounting for the completed work. |
|
|
Medical Equipment supply for Tieu Can Regional General Hospital in Tra Vinh Province - Location: Tra Vinh - Client: Tra Vinh Department of Health |
7/2009 – 5/2010 |
EDCF – Korea |
- Preparation of Feasibility Study Report - Consulting in the selection of contractors - Provision of consultancy services for supervision of equipment supply and installation. |
|
|
Strengthening the capacity of vocational training for Ha TinhVocational Training Intermediate College - Location: Ha Tinh - Client: Ha Tinh Vocational Training Intermediate College |
10/2008 -12/2008 |
EDCF – Korea |
- Preparation of detailed outline - Preparation of Feasibility Study Report
|
|
|
Training equipment supply for Gia Lai Vocational Training Intermediate College - Location: Gia Lai - Client: Gia Lai Vocational Training Intermediate College |
4/2008 - 6/2009 |
KFW – German |
- Preparation of Feasibility Study Report - Preparation of procurement plan - Implementing Bids Evaluation - Provision of consultancy services for supervision of equipment supply and installation. |
|
|
Training equipment supply for Thanh Hoa Industrial Vocational Training College
- Location: Thanh Hoa city - Client: Thanh Hoa Industrial Vocational Training College |
4/2008 - 2/2009
|
EDCF – Korea |
- Preparation of Feasibility Study Report - Preparation of Request for Proposal and Bids Evaluation, - Provision of consultancy services for supervision of equipment supply and installation. |
|
|
Medical equipment supply for Ha Trung General Hospital - Location: Thanh Hoa - Client: Ha Trung General Hospital |
4/2008 - 8/2011 |
EDCF – Korea |
- Preparation of Feasibility Study Report - Preparation of Request for Proposal and Bids Evaluation, - Provision of consultancy services for supervision of equipment supply and installation. |
|
|
Medical Equipment Supply for Pleiku General Hospital in Gia Lai Province - Location: Gia Lai - Client: Management Unit of Construction Investment Projects of Pleiku City |
4/2008 – 9/2008 |
EDCF – Korea |
- Preparation of Feasibility Study Report - Preparation of Request for Proposal and Bids Evaluation: |
|
|
Equipment supply for department of informatics, foreign language and multimedia applications - Location: Hanoi - Client: National Academy of Music |
2007 |
Capital of state budget |
- Preparation of economic-technical report - Preparation of Request for Proposal and Bids Evaluation, - Provision of consultancy services for supervision of equipment supply and installation. |
|
|
Strengthening the capacity of material and component study based on the micro and nano technology - Location: Hanoi - Client: University of Engineering and Technology –Vietnam National University |
2005 |
Capital of state budget |
- Preparation of Feasibility Study Report |
|
|
Investment in equipment of strengthening the capacity of science study and technology application implementation for labs of smart integrated systems - Location: Hanoi - Client: University of Engineering and Technology –Vietnam National University |
2005 |
Capital of state budget |
- Preparation of Feasibility Study Report
|
|
|
Water sector aid program funded by Italian Government, stage 1 - Location: Northern mountainous provinces - Client: Department of External Finance, Ministry of Finance |
2004 – 2008 |
ODA Italia |
Providing the service of procurement consultancy for the Program: - Stage 1: Preparation of procurement - Stage 2: Implementation of procurement process to select suppliers. - Stage 3: Implementation of procurement contracts. |
|